Building Stages

Standard Foundations


Panel Installation

Installation can be carried out by two workers, while fastening can be done by one worker using a standard tying tool or binding pliers.


Filling the Cavity with Concrete

After completing this stage, the cavity within the double panel is filled with concrete.


Installation of Floor Panel


Reinforcement and Concrete Pouring

After placing reinforcement in the designated cavities of the floor panel according to structural calculations, concrete is poured over the panel.


Channels for Plumbing and Electrical Installations

The channels are created easily and quickly using hot air.


Mesh Removal

After creating the required openings, the welded mesh is removed where necessary using rebar cutters.


Installation of Junction Boxes and Cables


Shotcrete Application

The finished walls are covered with cement mortar using a shotcrete machine before applying the final plaster layer.